Oracle Primavera Unifier26.10 - App Store

Please wait ... The app listing is being verified for availability.
You'll be able to see results in few seconds.


Publisher Description

By installing this app, you agree to the End User License Agreement terms at https://docs.oracle.com/cd/F11146_01/EULA/en/EULA.htm

The Oracle Primavera Unifier mobile app is the perfect companion for Unifier users on the go. Project managers and field users can use the Unifier mobile app to view, update, and collaborate on projects. Users can manage tasks, create business process records, and review documents. While offline, field users can continue to work on their downloaded project data and documents.

Unifier mobile app requires you to have a valid license for Primavera Unifier 16.2 and above. Oracle recommends that you upgrade your Primavera Unifier installation to the latest version to utilize all the features of the mobile app, as some of the recent features are supported only on the latest version of Primavera Unifier.

Features:

▪ Manage your assigned tasks and update task progress anywhere, anytime.
▪ Work on your downloaded company and project data without network connectivity.
▪ Synchronize locally saved changes with the Unifier server, once network connectivity is available.
▪ Create new business process records and add line items.
▪ Attach picture, audio, and video files to a business process record, line item, or task.
▪ Review drawings, pdf and image files etc., associated with business process records or in project documents.
▪ Minimize data entry errors by using QR code, bar codes, auto-population, and formula-calculation in the forms.
▪ Use commonly-used pickers and hyperlink fields when working on the forms.
▪ Access and save commonly-used company or project documents.
▪ Access frequently-used business processes faster by adding them as tiles to the Home screen.
▪ View the geo-location of projects and business process records.
▪ Get notified when tasks are assigned to you, without opening the Unifier mobile app.

Additional Information

▪ Oracle recommends that you always synchronize your locally saved changes with the Unifier server before upgrading to the latest version of the mobile app.
▪ The Unifier mobile app for iOS supports Apple OS version 12.0 and above.
▪ The app includes a demo mode that enables you to evaluate the app without a license or connection to Primavera Unifier.
▪ Ensure that the business processes are enabled for mobile app use, and you have the required access permissions to view the business processes by way of your mobile app.
▪ Contact your Unifier administrator if you have any questions.

Version History • Populate BP form fields using your voice with the new AI assistant.
• Generate AI summaries of related BP records directly from query-based tabs.
• Reset field values directly within workflow blueprints for greater flexibility.
• Recall documents easily from Document Manager.
• Attach or select documents at the final step with the new document picker support.
• Technical improvements and bug fixes. 26.10 Oct 5 • Resolved issues affecting Tasks Log refresh. 26.9.1 Sep 17 • Technical improvements and bug fixes. 26.9 Sep 4 • Technical improvements and bug fixes. 26.7 Jul 7 Technical improvements and bug fixes. 26.6 Jun 6 • Technical improvements and bug fixes. 26.5 May 10 • Added AI-powered Business Process (BP) summarization in mobile, bringing the same intelligent insights available on web to your fingertips.
• Introduced Document Picker Data Element support in mobile, enabling seamless document selection consistent with the web experience.
• Technical improvements and bug fixes. 26.4 Apr 8 • Technical improvements and bug fixes. 26.3 Mar 6 • Simplified UI for Form Edits - toggle to view only editable and required fields or return to the full form anytime while editing records.
• Technical improvements and bug fixes. 26.1 Jan 8 • Technical improvements and bug fixes. 25.12 12/05/2025 • Added a Camera icon on the Workspace Dashboard (inside each project workspace). Now users can quickly capture photos using their device’s camera without leaving the app and create records.
• Technical improvements and bug fixes. 25.11 11/07/2025 • Support for Line items Grouping is available on mobile. Line items now display under their assigned groups, with ungrouped items shown separately for better organization.
• BP pickers now respect query conditions configured in Business Process Configuration, including filters on Reference ID data elements.
• QBT-Defined log support is now accessible and functional on mobile if no mobile log view has been configured.
• Users can now send notifications to external stakeholders directly from mobile.
• Mobile now displays the action date of workflow tasks for better timeline tracking.
• Line items can now enforce uniqueness for designated fields during mobile entry or edits.
• View who last modified a record with support for the predefined “Last Modified By” element.
• The Tasks tile now shows a badge with the count of pending tasks for quick visibility.
• Technical improvements and bug fixes. 25.10 10/14/2025 • Technical improvements and bug fixes. 25.9 09/09/2025 • Technical improvements and bug fixes. 25.8 08/07/2025 • Technical improvements and bug fixes. 25.7 07/11/2025 • Technical improvements and bug fixes. 25.6.1 06/25/2025 • Technical improvements and bug fixes. 25.6 06/09/2025 • Enabled BP Creator Data Element to manually trigger the auto creation of record.
• Technical improvements and bug fixes. 25.5 05/07/2025 • Supporting permissions on BP record copy, ensuring controlled access and security.
• Support to capture multiple images via camera and upload them as individual files or merge them into a PDF for easy sharing.
• Technical improvements and bug fixes. 25.4 04/07/2025 • Upgrade minimum version to 16.x.
• Technical improvements and bug fixes. 25.3 03/06/2025 • Support for Query based filtering in QBDE.
• Technical improvements and bug fixes. 25.2 02/09/2025 • Support to download the user profile to device contacts from Project Directory.
• Technical improvements and bug fixes. 25.1 01/09/2025 • Technical improvements and bug fixes. 24.12 12/10/2024 • Technical improvements and bug fixes. 24.11 11/08/2024 • Support for PDFTron.
• Technical improvements and bug fixes. 24.10 10/05/2024



About Oracle Primavera Unifier

Oracle Primavera Unifier is a free app for iOS published in the Vertical Market Apps list of apps, part of Business.

The company that develops Oracle Primavera Unifier is Oracle America, Inc.. The latest version released by its developer is 26.10.

To install Oracle Primavera Unifier on your iOS device, just click the green Continue To App button above to start the installation process. The app is listed on our website since 2026-10-13 and was downloaded 0 times. We have already checked if the download link is safe, however for your own protection we recommend that you scan the downloaded app with your antivirus. Your antivirus may detect the Oracle Primavera Unifier as malware if the download link is broken.

How to install Oracle Primavera Unifier on your iOS device:

  • Click on the Continue To App button on our website. This will redirect you to the App Store.
  • Once the Oracle Primavera Unifier is shown in the iTunes listing of your iOS device, you can start its download and installation. Tap on the GET button to the right of the app to start downloading it.
  • If you are not logged-in the iOS appstore app, you'll be prompted for your your Apple ID and/or password.
  • After Oracle Primavera Unifier is downloaded, you'll see an INSTALL button to the right. Tap on it to start the actual installation of the iOS app.
  • Once installation is finished you can tap on the OPEN button to start it. Its icon will also be added to your device home screen.

Program Details


General

Publisher
Released Date
2026-10-13
Languages
English

Category

Category
Subcategory

System requirements

Operating systems
iOS

Download information

File size
112 bytes
Total downloads
0

Pricing

License model
Free
Price

Version History


Here you can find the changelog of Oracle Primavera Unifier since it was posted on our website on 2023-09-05. The latest version is 26.10 and it was updated on Apps112 on 01 November, 2026. See below the changes in each version:

version 26.10

posted on 2026-10-13

Version History • Populate BP form fields using your voice with the new AI assistant.
• Generate AI summaries of related BP records directly from query-based tabs.
• Reset field values directly within workflow blueprints for greater flexibility.
• Recall documents easily from Document Manager.
• Attach or select documents at the final step with the new document picker support.
• Technical improvements and bug fixes. 26.10 Oct 5 • Resolved issues affecting Tasks Log refresh. 26.9.1 Sep 17 • Technical improvements and bug fixes. 26.9 Sep 4 • Technical improvements and bug fixes. 26.7 Jul 7 Technical improvements and bug fixes. 26.6 Jun 6 • Technical improvements and bug fixes. 26.5 May 10 • Added AI-powered Business Process (BP) summarization in mobile, bringing the same intelligent insights available on web to your fingertips.
• Introduced Document Picker Data Element support in mobile, enabling seamless document selection consistent with the web experience.
• Technical improvements and bug fixes. 26.4 Apr 8 • Technical improvements and bug fixes. 26.3 Mar 6 • Simplified UI for Form Edits - toggle to view only editable and required fields or return to the full form anytime while editing records.
• Technical improvements and bug fixes. 26.1 Jan 8 • Technical improvements and bug fixes. 25.12 12/05/2025 • Added a Camera icon on the Workspace Dashboard (inside each project workspace). Now users can quickly capture photos using their device’s camera without leaving the app and create records.
• Technical improvements and bug fixes. 25.11 11/07/2025 • Support for Line items Grouping is available on mobile. Line items now display under their assigned groups, with ungrouped items shown separately for better organization.
• BP pickers now respect query conditions configured in Business Process Configuration, including filters on Reference ID data elements.
• QBT-Defined log support is now accessible and functional on mobile if no mobile log view has been configured.
• Users can now send notifications to external stakeholders directly from mobile.
• Mobile now displays the action date of workflow tasks for better timeline tracking.
• Line items can now enforce uniqueness for designated fields during mobile entry or edits.
• View who last modified a record with support for the predefined “Last Modified By” element.
• The Tasks tile now shows a badge with the count of pending tasks for quick visibility.
• Technical improvements and bug fixes. 25.10 10/14/2025 • Technical improvements and bug fixes. 25.9 09/09/2025 • Technical improvements and bug fixes. 25.8 08/07/2025 • Technical improvements and bug fixes. 25.7 07/11/2025 • Technical improvements and bug fixes. 25.6.1 06/25/2025 • Technical improvements and bug fixes. 25.6 06/09/2025 • Enabled BP Creator Data Element to manually trigger the auto creation of record.
• Technical improvements and bug fixes. 25.5 05/07/2025 • Supporting permissions on BP record copy, ensuring controlled access and security.
• Support to capture multiple images via camera and upload them as individual files or merge them into a PDF for easy sharing.
• Technical improvements and bug fixes. 25.4 04/07/2025 • Upgrade minimum version to 16.x.
• Technical improvements and bug fixes. 25.3 03/06/2025 • Support for Query based filtering in QBDE.
• Technical improvements and bug fixes. 25.2 02/09/2025 • Support to download the user profile to device contacts from Project Directory.
• Technical improvements and bug fixes. 25.1 01/09/2025 • Technical improvements and bug fixes. 24.12 12/10/2024 • Technical improvements and bug fixes. 24.11 11/08/2024 • Support for PDFTron.
• Technical improvements and bug fixes. 24.10 10/05/2024

version 26.10

posted on 2026-10-06

Version History • Populate BP form fields using your voice with the new AI assistant.
• Generate AI summaries of related BP records directly from query-based tabs.
• Reset field values directly within workflow blueprints for greater flexibility.
• Recall documents easily from Document Manager.
• Attach or select documents at the final step with the new document picker support.
• Technical improvements and bug fixes. 26.10 14h ago • Resolved issues affecting Tasks Log refresh. 26.9.1 Sep 17 • Technical improvements and bug fixes. 26.9 Sep 4 • Technical improvements and bug fixes. 26.7 Jul 7 Technical improvements and bug fixes. 26.6 Jun 6 • Technical improvements and bug fixes. 26.5 May 10 • Added AI-powered Business Process (BP) summarization in mobile, bringing the same intelligent insights available on web to your fingertips.
• Introduced Document Picker Data Element support in mobile, enabling seamless document selection consistent with the web experience.
• Technical improvements and bug fixes. 26.4 Apr 8 • Technical improvements and bug fixes. 26.3 Mar 6 • Simplified UI for Form Edits - toggle to view only editable and required fields or return to the full form anytime while editing records.
• Technical improvements and bug fixes. 26.1 Jan 8 • Technical improvements and bug fixes. 25.12 12/05/2025 • Added a Camera icon on the Workspace Dashboard (inside each project workspace). Now users can quickly capture photos using their device’s camera without leaving the app and create records.
• Technical improvements and bug fixes. 25.11 11/07/2025 • Support for Line items Grouping is available on mobile. Line items now display under their assigned groups, with ungrouped items shown separately for better organization.
• BP pickers now respect query conditions configured in Business Process Configuration, including filters on Reference ID data elements.
• QBT-Defined log support is now accessible and functional on mobile if no mobile log view has been configured.
• Users can now send notifications to external stakeholders directly from mobile.
• Mobile now displays the action date of workflow tasks for better timeline tracking.
• Line items can now enforce uniqueness for designated fields during mobile entry or edits.
• View who last modified a record with support for the predefined “Last Modified By” element.
• The Tasks tile now shows a badge with the count of pending tasks for quick visibility.
• Technical improvements and bug fixes. 25.10 10/14/2025 • Technical improvements and bug fixes. 25.9 09/09/2025 • Technical improvements and bug fixes. 25.8 08/07/2025 • Technical improvements and bug fixes. 25.7 07/11/2025 • Technical improvements and bug fixes. 25.6.1 06/25/2025 • Technical improvements and bug fixes. 25.6 06/09/2025 • Enabled BP Creator Data Element to manually trigger the auto creation of record.
• Technical improvements and bug fixes. 25.5 05/07/2025 • Supporting permissions on BP record copy, ensuring controlled access and security.
• Support to capture multiple images via camera and upload them as individual files or merge them into a PDF for easy sharing.
• Technical improvements and bug fixes. 25.4 04/07/2025 • Upgrade minimum version to 16.x.
• Technical improvements and bug fixes. 25.3 03/06/2025 • Support for Query based filtering in QBDE.
• Technical improvements and bug fixes. 25.2 02/09/2025 • Support to download the user profile to device contacts from Project Directory.
• Technical improvements and bug fixes. 25.1 01/09/2025 • Technical improvements and bug fixes. 24.12 12/10/2024 • Technical improvements and bug fixes. 24.11 11/08/2024 • Support for PDFTron.
• Technical improvements and bug fixes. 24.10 10/05/2024

version 26.9.1

posted on 2026-10-02

Version History • Resolved issues affecting Tasks Log refresh. 26.9.1 Sep 17 • Technical improvements and bug fixes. 26.9 Sep 4 • Technical improvements and bug fixes. 26.7 Jul 7 Technical improvements and bug fixes. 26.6 Jun 6 • Technical improvements and bug fixes. 26.5 May 10 • Added AI-powered Business Process (BP) summarization in mobile, bringing the same intelligent insights available on web to your fingertips.
• Introduced Document Picker Data Element support in mobile, enabling seamless document selection consistent with the web experience.
• Technical improvements and bug fixes. 26.4 Apr 8 • Technical improvements and bug fixes. 26.3 Mar 6 • Simplified UI for Form Edits - toggle to view only editable and required fields or return to the full form anytime while editing records.
• Technical improvements and bug fixes. 26.1 Jan 8 • Technical improvements and bug fixes. 25.12 12/05/2025 • Added a Camera icon on the Workspace Dashboard (inside each project workspace). Now users can quickly capture photos using their device’s camera without leaving the app and create records.
• Technical improvements and bug fixes. 25.11 11/07/2025 • Support for Line items Grouping is available on mobile. Line items now display under their assigned groups, with ungrouped items shown separately for better organization.
• BP pickers now respect query conditions configured in Business Process Configuration, including filters on Reference ID data elements.
• QBT-Defined log support is now accessible and functional on mobile if no mobile log view has been configured.
• Users can now send notifications to external stakeholders directly from mobile.
• Mobile now displays the action date of workflow tasks for better timeline tracking.
• Line items can now enforce uniqueness for designated fields during mobile entry or edits.
• View who last modified a record with support for the predefined “Last Modified By” element.
• The Tasks tile now shows a badge with the count of pending tasks for quick visibility.
• Technical improvements and bug fixes. 25.10 10/14/2025 • Technical improvements and bug fixes. 25.9 09/09/2025 • Technical improvements and bug fixes. 25.8 08/07/2025 • Technical improvements and bug fixes. 25.7 07/11/2025 • Technical improvements and bug fixes. 25.6.1 06/25/2025 • Technical improvements and bug fixes. 25.6 06/09/2025 • Enabled BP Creator Data Element to manually trigger the auto creation of record.
• Technical improvements and bug fixes. 25.5 05/07/2025 • Supporting permissions on BP record copy, ensuring controlled access and security.
• Support to capture multiple images via camera and upload them as individual files or merge them into a PDF for easy sharing.
• Technical improvements and bug fixes. 25.4 04/07/2025 • Upgrade minimum version to 16.x.
• Technical improvements and bug fixes. 25.3 03/06/2025 • Support for Query based filtering in QBDE.
• Technical improvements and bug fixes. 25.2 02/09/2025 • Support to download the user profile to device contacts from Project Directory.
• Technical improvements and bug fixes. 25.1 01/09/2025 • Technical improvements and bug fixes. 24.12 12/10/2024 • Technical improvements and bug fixes. 24.11 11/08/2024 • Support for PDFTron.
• Technical improvements and bug fixes. 24.10 10/05/2024 • The ability to switch between recently accessed servers while logging in has been enabled. On the Login screen, the user will be able to choose a recently visited URL from a dropdown menu.
• Technical improvements and bug fixes 24.9 09/07/2024

version 26.9.1

posted on 2026-09-18

Version History • Resolved issues affecting Tasks Log refresh. 26.9.1 22h ago • Technical improvements and bug fixes. 26.9 Sep 4 • Technical improvements and bug fixes. 26.7 Jul 7 Technical improvements and bug fixes. 26.6 Jun 6 • Technical improvements and bug fixes. 26.5 May 10 • Added AI-powered Business Process (BP) summarization in mobile, bringing the same intelligent insights available on web to your fingertips.
• Introduced Document Picker Data Element support in mobile, enabling seamless document selection consistent with the web experience.
• Technical improvements and bug fixes. 26.4 Apr 8 • Technical improvements and bug fixes. 26.3 Mar 6 • Simplified UI for Form Edits - toggle to view only editable and required fields or return to the full form anytime while editing records.
• Technical improvements and bug fixes. 26.1 Jan 8 • Technical improvements and bug fixes. 25.12 12/05/2025 • Added a Camera icon on the Workspace Dashboard (inside each project workspace). Now users can quickly capture photos using their device’s camera without leaving the app and create records.
• Technical improvements and bug fixes. 25.11 11/07/2025 • Support for Line items Grouping is available on mobile. Line items now display under their assigned groups, with ungrouped items shown separately for better organization.
• BP pickers now respect query conditions configured in Business Process Configuration, including filters on Reference ID data elements.
• QBT-Defined log support is now accessible and functional on mobile if no mobile log view has been configured.
• Users can now send notifications to external stakeholders directly from mobile.
• Mobile now displays the action date of workflow tasks for better timeline tracking.
• Line items can now enforce uniqueness for designated fields during mobile entry or edits.
• View who last modified a record with support for the predefined “Last Modified By” element.
• The Tasks tile now shows a badge with the count of pending tasks for quick visibility.
• Technical improvements and bug fixes. 25.10 10/14/2025 • Technical improvements and bug fixes. 25.9 09/09/2025 • Technical improvements and bug fixes. 25.8 08/07/2025 • Technical improvements and bug fixes. 25.7 07/11/2025 • Technical improvements and bug fixes. 25.6.1 06/25/2025 • Technical improvements and bug fixes. 25.6 06/09/2025 • Enabled BP Creator Data Element to manually trigger the auto creation of record.
• Technical improvements and bug fixes. 25.5 05/07/2025 • Supporting permissions on BP record copy, ensuring controlled access and security.
• Support to capture multiple images via camera and upload them as individual files or merge them into a PDF for easy sharing.
• Technical improvements and bug fixes. 25.4 04/07/2025 • Upgrade minimum version to 16.x.
• Technical improvements and bug fixes. 25.3 03/06/2025 • Support for Query based filtering in QBDE.
• Technical improvements and bug fixes. 25.2 02/09/2025 • Support to download the user profile to device contacts from Project Directory.
• Technical improvements and bug fixes. 25.1 01/09/2025 • Technical improvements and bug fixes. 24.12 12/10/2024 • Technical improvements and bug fixes. 24.11 11/08/2024 • Support for PDFTron.
• Technical improvements and bug fixes. 24.10 10/05/2024 • The ability to switch between recently accessed servers while logging in has been enabled. On the Login screen, the user will be able to choose a recently visited URL from a dropdown menu.
• Technical improvements and bug fixes 24.9 09/07/2024

version 26.9

posted on 2026-09-11

Version History • Technical improvements and bug fixes. 26.9 6d ago • Technical improvements and bug fixes. 26.7 Jul 7 Technical improvements and bug fixes. 26.6 Jun 6 • Technical improvements and bug fixes. 26.5 May 10 • Added AI-powered Business Process (BP) summarization in mobile, bringing the same intelligent insights available on web to your fingertips.
• Introduced Document Picker Data Element support in mobile, enabling seamless document selection consistent with the web experience.
• Technical improvements and bug fixes. 26.4 Apr 8 • Technical improvements and bug fixes. 26.3 Mar 6 • Simplified UI for Form Edits - toggle to view only editable and required fields or return to the full form anytime while editing records.
• Technical improvements and bug fixes. 26.1 Jan 8 • Technical improvements and bug fixes. 25.12 12/05/2025 • Added a Camera icon on the Workspace Dashboard (inside each project workspace). Now users can quickly capture photos using their device’s camera without leaving the app and create records.
• Technical improvements and bug fixes. 25.11 11/07/2025 • Support for Line items Grouping is available on mobile. Line items now display under their assigned groups, with ungrouped items shown separately for better organization.
• BP pickers now respect query conditions configured in Business Process Configuration, including filters on Reference ID data elements.
• QBT-Defined log support is now accessible and functional on mobile if no mobile log view has been configured.
• Users can now send notifications to external stakeholders directly from mobile.
• Mobile now displays the action date of workflow tasks for better timeline tracking.
• Line items can now enforce uniqueness for designated fields during mobile entry or edits.
• View who last modified a record with support for the predefined “Last Modified By” element.
• The Tasks tile now shows a badge with the count of pending tasks for quick visibility.
• Technical improvements and bug fixes. 25.10 10/14/2025 • Technical improvements and bug fixes. 25.9 09/09/2025 • Technical improvements and bug fixes. 25.8 08/07/2025 • Technical improvements and bug fixes. 25.7 07/11/2025 • Technical improvements and bug fixes. 25.6.1 06/25/2025 • Technical improvements and bug fixes. 25.6 06/09/2025 • Enabled BP Creator Data Element to manually trigger the auto creation of record.
• Technical improvements and bug fixes. 25.5 05/07/2025 • Supporting permissions on BP record copy, ensuring controlled access and security.
• Support to capture multiple images via camera and upload them as individual files or merge them into a PDF for easy sharing.
• Technical improvements and bug fixes. 25.4 04/07/2025 • Upgrade minimum version to 16.x.
• Technical improvements and bug fixes. 25.3 03/06/2025 • Support for Query based filtering in QBDE.
• Technical improvements and bug fixes. 25.2 02/09/2025 • Support to download the user profile to device contacts from Project Directory.
• Technical improvements and bug fixes. 25.1 01/09/2025 • Technical improvements and bug fixes. 24.12 12/10/2024 • Technical improvements and bug fixes. 24.11 11/08/2024 • Support for PDFTron.
• Technical improvements and bug fixes. 24.10 10/05/2024 • The ability to switch between recently accessed servers while logging in has been enabled. On the Login screen, the user will be able to choose a recently visited URL from a dropdown menu.
• Technical improvements and bug fixes 24.9 09/07/2024 • Technical improvements and bug fixes. 24.8.1 08/16/2024

version 26.7

posted on 2026-09-04

Version History • Technical improvements and bug fixes. 26.7 Jul 7 Technical improvements and bug fixes. 26.6 Jun 6 • Technical improvements and bug fixes. 26.5 May 10 • Added AI-powered Business Process (BP) summarization in mobile, bringing the same intelligent insights available on web to your fingertips.
• Introduced Document Picker Data Element support in mobile, enabling seamless document selection consistent with the web experience.
• Technical improvements and bug fixes. 26.4 Apr 8 • Technical improvements and bug fixes. 26.3 Mar 6 • Simplified UI for Form Edits - toggle to view only editable and required fields or return to the full form anytime while editing records.
• Technical improvements and bug fixes. 26.1 Jan 8 • Technical improvements and bug fixes. 25.12 12/05/2025 • Added a Camera icon on the Workspace Dashboard (inside each project workspace). Now users can quickly capture photos using their device’s camera without leaving the app and create records.
• Technical improvements and bug fixes. 25.11 11/07/2025 • Support for Line items Grouping is available on mobile. Line items now display under their assigned groups, with ungrouped items shown separately for better organization.
• BP pickers now respect query conditions configured in Business Process Configuration, including filters on Reference ID data elements.
• QBT-Defined log support is now accessible and functional on mobile if no mobile log view has been configured.
• Users can now send notifications to external stakeholders directly from mobile.
• Mobile now displays the action date of workflow tasks for better timeline tracking.
• Line items can now enforce uniqueness for designated fields during mobile entry or edits.
• View who last modified a record with support for the predefined “Last Modified By” element.
• The Tasks tile now shows a badge with the count of pending tasks for quick visibility.
• Technical improvements and bug fixes. 25.10 10/14/2025 • Technical improvements and bug fixes. 25.9 09/09/2025 • Technical improvements and bug fixes. 25.8 08/07/2025 • Technical improvements and bug fixes. 25.7 07/11/2025 • Technical improvements and bug fixes. 25.6.1 06/25/2025 • Technical improvements and bug fixes. 25.6 06/09/2025 • Enabled BP Creator Data Element to manually trigger the auto creation of record.
• Technical improvements and bug fixes. 25.5 05/07/2025 • Supporting permissions on BP record copy, ensuring controlled access and security.
• Support to capture multiple images via camera and upload them as individual files or merge them into a PDF for easy sharing.
• Technical improvements and bug fixes. 25.4 04/07/2025 • Upgrade minimum version to 16.x.
• Technical improvements and bug fixes. 25.3 03/06/2025 • Support for Query based filtering in QBDE.
• Technical improvements and bug fixes. 25.2 02/09/2025 • Support to download the user profile to device contacts from Project Directory.
• Technical improvements and bug fixes. 25.1 01/09/2025 • Technical improvements and bug fixes. 24.12 12/10/2024 • Technical improvements and bug fixes. 24.11 11/08/2024 • Support for PDFTron.
• Technical improvements and bug fixes. 24.10 10/05/2024 • The ability to switch between recently accessed servers while logging in has been enabled. On the Login screen, the user will be able to choose a recently visited URL from a dropdown menu.
• Technical improvements and bug fixes 24.9 09/07/2024 • Technical improvements and bug fixes. 24.8.1 08/16/2024 • Support for accessing project directory in mobile.
• Technical improvements and bug fixes. 24.8 08/08/2024

version 26.7

posted on 2026-07-09

Version History • Technical improvements and bug fixes. 26.7 2d ago Technical improvements and bug fixes. 26.6 Jun 6 • Technical improvements and bug fixes. 26.5 May 10 • Added AI-powered Business Process (BP) summarization in mobile, bringing the same intelligent insights available on web to your fingertips.
• Introduced Document Picker Data Element support in mobile, enabling seamless document selection consistent with the web experience.
• Technical improvements and bug fixes. 26.4 Apr 8 • Technical improvements and bug fixes. 26.3 Mar 6 • Simplified UI for Form Edits - toggle to view only editable and required fields or return to the full form anytime while editing records.
• Technical improvements and bug fixes. 26.1 Jan 8 • Technical improvements and bug fixes. 25.12 12/05/2025 • Added a Camera icon on the Workspace Dashboard (inside each project workspace). Now users can quickly capture photos using their device’s camera without leaving the app and create records.
• Technical improvements and bug fixes. 25.11 11/07/2025 • Support for Line items Grouping is available on mobile. Line items now display under their assigned groups, with ungrouped items shown separately for better organization.
• BP pickers now respect query conditions configured in Business Process Configuration, including filters on Reference ID data elements.
• QBT-Defined log support is now accessible and functional on mobile if no mobile log view has been configured.
• Users can now send notifications to external stakeholders directly from mobile.
• Mobile now displays the action date of workflow tasks for better timeline tracking.
• Line items can now enforce uniqueness for designated fields during mobile entry or edits.
• View who last modified a record with support for the predefined “Last Modified By” element.
• The Tasks tile now shows a badge with the count of pending tasks for quick visibility.
• Technical improvements and bug fixes. 25.10 10/14/2025 • Technical improvements and bug fixes. 25.9 09/09/2025 • Technical improvements and bug fixes. 25.8 08/07/2025 • Technical improvements and bug fixes. 25.7 07/11/2025 • Technical improvements and bug fixes. 25.6.1 06/25/2025 • Technical improvements and bug fixes. 25.6 06/09/2025 • Enabled BP Creator Data Element to manually trigger the auto creation of record.
• Technical improvements and bug fixes. 25.5 05/07/2025 • Supporting permissions on BP record copy, ensuring controlled access and security.
• Support to capture multiple images via camera and upload them as individual files or merge them into a PDF for easy sharing.
• Technical improvements and bug fixes. 25.4 04/07/2025 • Upgrade minimum version to 16.x.
• Technical improvements and bug fixes. 25.3 03/06/2025 • Support for Query based filtering in QBDE.
• Technical improvements and bug fixes. 25.2 02/09/2025 • Support to download the user profile to device contacts from Project Directory.
• Technical improvements and bug fixes. 25.1 01/09/2025 • Technical improvements and bug fixes. 24.12 12/10/2024 • Technical improvements and bug fixes. 24.11 11/08/2024 • Support for PDFTron.
• Technical improvements and bug fixes. 24.10 10/05/2024 • The ability to switch between recently accessed servers while logging in has been enabled. On the Login screen, the user will be able to choose a recently visited URL from a dropdown menu.
• Technical improvements and bug fixes 24.9 09/07/2024 • Technical improvements and bug fixes. 24.8.1 08/16/2024 • Support for accessing project directory in mobile.
• Technical improvements and bug fixes. 24.8 08/08/2024

version 26.6

posted on 2026-06-30

Version History Technical improvements and bug fixes. 26.6 Jun 6 • Technical improvements and bug fixes. 26.5 May 10 • Added AI-powered Business Process (BP) summarization in mobile, bringing the same intelligent insights available on web to your fingertips.
• Introduced Document Picker Data Element support in mobile, enabling seamless document selection consistent with the web experience.
• Technical improvements and bug fixes. 26.4 Apr 8 • Technical improvements and bug fixes. 26.3 Mar 6 • Simplified UI for Form Edits - toggle to view only editable and required fields or return to the full form anytime while editing records.
• Technical improvements and bug fixes. 26.1 Jan 8 • Technical improvements and bug fixes. 25.12 12/05/2025 • Added a Camera icon on the Workspace Dashboard (inside each project workspace). Now users can quickly capture photos using their device’s camera without leaving the app and create records.
• Technical improvements and bug fixes. 25.11 11/07/2025 • Support for Line items Grouping is available on mobile. Line items now display under their assigned groups, with ungrouped items shown separately for better organization.
• BP pickers now respect query conditions configured in Business Process Configuration, including filters on Reference ID data elements.
• QBT-Defined log support is now accessible and functional on mobile if no mobile log view has been configured.
• Users can now send notifications to external stakeholders directly from mobile.
• Mobile now displays the action date of workflow tasks for better timeline tracking.
• Line items can now enforce uniqueness for designated fields during mobile entry or edits.
• View who last modified a record with support for the predefined “Last Modified By” element.
• The Tasks tile now shows a badge with the count of pending tasks for quick visibility.
• Technical improvements and bug fixes. 25.10 10/14/2025 • Technical improvements and bug fixes. 25.9 09/09/2025 • Technical improvements and bug fixes. 25.8 08/07/2025 • Technical improvements and bug fixes. 25.7 07/11/2025 • Technical improvements and bug fixes. 25.6.1 06/25/2025 • Technical improvements and bug fixes. 25.6 06/09/2025 • Enabled BP Creator Data Element to manually trigger the auto creation of record.
• Technical improvements and bug fixes. 25.5 05/07/2025 • Supporting permissions on BP record copy, ensuring controlled access and security.
• Support to capture multiple images via camera and upload them as individual files or merge them into a PDF for easy sharing.
• Technical improvements and bug fixes. 25.4 04/07/2025 • Upgrade minimum version to 16.x.
• Technical improvements and bug fixes. 25.3 03/06/2025 • Support for Query based filtering in QBDE.
• Technical improvements and bug fixes. 25.2 02/09/2025 • Support to download the user profile to device contacts from Project Directory.
• Technical improvements and bug fixes. 25.1 01/09/2025 • Technical improvements and bug fixes. 24.12 12/10/2024 • Technical improvements and bug fixes. 24.11 11/08/2024 • Support for PDFTron.
• Technical improvements and bug fixes. 24.10 10/05/2024 • The ability to switch between recently accessed servers while logging in has been enabled. On the Login screen, the user will be able to choose a recently visited URL from a dropdown menu.
• Technical improvements and bug fixes 24.9 09/07/2024 • Technical improvements and bug fixes. 24.8.1 08/16/2024 • Support for accessing project directory in mobile.
• Technical improvements and bug fixes. 24.8 08/08/2024 • Technical improvements and bug fixes. 24.7 07/08/2024

version 26.5

posted on 2026-06-03

Version History • Technical improvements and bug fixes. 26.5 May 10 • Added AI-powered Business Process (BP) summarization in mobile, bringing the same intelligent insights available on web to your fingertips.
• Introduced Document Picker Data Element support in mobile, enabling seamless document selection consistent with the web experience.
• Technical improvements and bug fixes. 26.4 Apr 8 • Technical improvements and bug fixes. 26.3 Mar 6 • Simplified UI for Form Edits - toggle to view only editable and required fields or return to the full form anytime while editing records.
• Technical improvements and bug fixes. 26.1 Jan 8 • Technical improvements and bug fixes. 25.12 12/05/2025 • Added a Camera icon on the Workspace Dashboard (inside each project workspace). Now users can quickly capture photos using their device’s camera without leaving the app and create records.
• Technical improvements and bug fixes. 25.11 11/07/2025 • Support for Line items Grouping is available on mobile. Line items now display under their assigned groups, with ungrouped items shown separately for better organization.
• BP pickers now respect query conditions configured in Business Process Configuration, including filters on Reference ID data elements.
• QBT-Defined log support is now accessible and functional on mobile if no mobile log view has been configured.
• Users can now send notifications to external stakeholders directly from mobile.
• Mobile now displays the action date of workflow tasks for better timeline tracking.
• Line items can now enforce uniqueness for designated fields during mobile entry or edits.
• View who last modified a record with support for the predefined “Last Modified By” element.
• The Tasks tile now shows a badge with the count of pending tasks for quick visibility.
• Technical improvements and bug fixes. 25.10 10/14/2025 • Technical improvements and bug fixes. 25.9 09/09/2025 • Technical improvements and bug fixes. 25.8 08/07/2025 • Technical improvements and bug fixes. 25.7 07/11/2025 • Technical improvements and bug fixes. 25.6.1 06/25/2025 • Technical improvements and bug fixes. 25.6 06/09/2025 • Enabled BP Creator Data Element to manually trigger the auto creation of record.
• Technical improvements and bug fixes. 25.5 05/07/2025 • Supporting permissions on BP record copy, ensuring controlled access and security.
• Support to capture multiple images via camera and upload them as individual files or merge them into a PDF for easy sharing.
• Technical improvements and bug fixes. 25.4 04/07/2025 • Upgrade minimum version to 16.x.
• Technical improvements and bug fixes. 25.3 03/06/2025 • Support for Query based filtering in QBDE.
• Technical improvements and bug fixes. 25.2 02/09/2025 • Support to download the user profile to device contacts from Project Directory.
• Technical improvements and bug fixes. 25.1 01/09/2025 • Technical improvements and bug fixes. 24.12 12/10/2024 • Technical improvements and bug fixes. 24.11 11/08/2024 • Support for PDFTron.
• Technical improvements and bug fixes. 24.10 10/05/2024 • The ability to switch between recently accessed servers while logging in has been enabled. On the Login screen, the user will be able to choose a recently visited URL from a dropdown menu.
• Technical improvements and bug fixes 24.9 09/07/2024 • Technical improvements and bug fixes. 24.8.1 08/16/2024 • Support for accessing project directory in mobile.
• Technical improvements and bug fixes. 24.8 08/08/2024 • Technical improvements and bug fixes. 24.7 07/08/2024 • Technical improvements and bug fixes. 24.6 06/10/2024

version 26.3

posted on 2026-03-06

• Technical improvements and bug fixes.

Disclaimer


Official App Store Link


We do not host Oracle Primavera Unifier on our servers. We did not scan it for viruses, adware, spyware or other type of malware. This app is hosted by Apple and passed their terms and conditions to be listed there. We recommend caution when installing it.

The App Store link for Oracle Primavera Unifier is provided to you by apps112.com without any warranties, representations or guarantees of any kind, so access it at your own risk.

If you have questions regarding this particular app contact the publisher directly. For questions about the functionalities of apps112.com contact us.





Click stars to rate this APP!

Users Rating:
  0.0/5     0
Downloads: 0
Updated At: 2026-11-01
Operating System: iOS
License Type: Free

TOP DOWNLOADS
in Business last week